Facebook January 26, 2014 at 07:32PM
After 1 months of procrastination and house repairs, I started designing and sourcing parts for the 4 way sliding door for a room during Christmas. I then spent the past month building and testing the design while being sick from the flu. I got sick because I had to do all the cutting outside in sub zero temp. But it was well worth the trouble. I can now finally fully rent out the place and be cash flow positive, which means I am free of this burden.
Leave a Reply